ASPIRE PROJECT: ESMP to the proposed 5MW solar PV System in Greater Male’ area(Draft 1)
ASPIRE PROJECT: Operations Phase Tenant Feedback Survey
ASPIRE PROJECT: ESMP for Hulhumale PV Final
ASPIRE PROJECT: 1.5MW Solar Installation at Hulhumale 1000 Housing Units Project: Feedback Survey
ASPIRE PROJECT: Annual Report on Operation and Maintenance of Hulhumale’ 1.5MW Photovoltaic System ASPIRE Lot Two (Second Year:2019.4-2020.3)
ASPIRE PROJECT: Bi-annual Report on Operation and Maintenance of Hulhumale’ 1.5MW Photovoltaic System – ASPIRE Lot Two
Quarterly Environmental Monitoring Report – Greater Malé Environmental Improvement and Waste Management Project – 51077-003 (September 2021)
Semi-Annual Environmental Monitoring Report – Greater Malé Environmental Improvement and Waste Management Project-51077-002 (October 2021)
Semi-Annual Environmental Monitoring Report – Greater Malé Environmental Improvement and Waste Management Project
Quarterly Environmental Monitoring Report – Greater Malé Waste-To-Energy(WTE) Project